Data · Digital · Operational Excellence

ShivTechAnalytics & Solutions

Turning data & shop-floor challenges into business results. Manufacturing-focused consulting and analytics for Productivity, Quality, Cost, Delivery, Safety and Morale.

Find losses · Solve problems · Prove results

Manufacturing → data

Every machine, shift and inspection is already producing data.

Output counts, cycle times, rejections, rework, downtime reasons, changeovers, near misses, audit scores. Manufacturing creates data continuously. Very little of it reaches a decision.

The business problem

Your factory generates data.But is it creating improvement?

  • Production
  • Quality
  • Cost
  • Delivery
  • Safety
  • People

Raw data → analysis → root cause → action → result

What ShivTech delivers

Find the loss. Solve the problem. Prove the result.

01

Find losses

Identify profit leakage across productivity, quality, cost, delivery, safety and people.

02

Solve problems

Data, root-cause analysis, Lean, 5S, TPM, Kaizen and practical shop-floor action.

03

Prove results

KPIs, annualised savings, performance and improvement sustainability.

Improve what matters

PQCDSM — the six dimensions that decide plant performance.

P

Productivity

Maximise efficiency and capacity

  • OEE / OLE
  • Capacity
  • Bottlenecks
  • Cycle time
  • Manpower

Production flow → constraint → recovered output

Q

Quality

Reduce defects, improve first-pass yield

  • Rejection
  • Rework
  • FPY
  • COPQ
  • RCA
  • CAPA

Defect → root cause → correction → improvement

C

Cost

Reduce cost, improve margins

  • Material
  • Labour
  • Energy
  • Scrap
  • Inventory
  • Profitability

Loss → analysis → savings

D

Delivery

Improve on-time delivery

  • Plan vs actual
  • OTD
  • WIP
  • Lead time
  • Changeover

Plan → flow → on-time delivery

S

Safety

Safer workplace, closed actions

  • Risk
  • Audits
  • Near miss
  • 5S / 6S
  • Action closure

Risk identified → action → closure verified

M

Morale / People

Engaged people, better performance

  • Skill matrix
  • Kaizen
  • Training
  • Engagement
  • Recognition

Skill → involvement → sustained improvement

Illustrative analytics view

Data is only powerful when it drives a decision.

Shop-floor data becomes KPI cards, trends, Pareto and loss analysis in Power BI — built so a review meeting ends with an owner and an action, not a discussion about the numbers.

PQCDSM dashboard · illustrative analytics view

Productivity

OEE

Quality

Rejection %

Cost

Savings

Delivery

OTD %

Safety

Incidents

Morale

Engagement

Illustrative only — not live client data.

How we work

The ShivTech Method

  1. 01

    Measure

    Collect the right information from the process, not just the report.

  2. 02

    Analyze

    Find the patterns and the root cause behind the loss.

  3. 03

    Improve

    Implement practical action on the shop floor.

  4. 04

    Quantify

    Measure the financial and business impact.

  5. 05

    Sustain

    Track whether the improvement stays in place.

  6. 06

    Scale

    Extend what worked to the next line, cell or plant.

Selected improvement results

Results that can be measured.

+0%

Production improvement

64 → 84 units per shift

0.00L+

Quantified annual savings

₹0 → ₹5L → ₹10L → ₹17.83L+

0.00 Cr

Inventory reduction

Working capital released

0%

Reduction in first-aid cases

24 → 5 cases

65% → 0%

5S improvement

Sustained for one year

0%

Rubbing noise reduction

Root cause corrected at source

Before

  • Hidden losses
  • Inefficiency
  • Rework
  • Delays
  • Risk

Analysis → Action

After

  • Improved productivity
  • Reduced quality losses
  • Cost savings
  • Better delivery
  • Safer workplace
  • Engaged people

Case studies

From shop floor to business impact.

Selected improvement project · Productivity

The challenge
Shift-wise production output was below the required level at the assembly set-up.
What we analysed
Shift-wise output tracked from Mar-22 through Jun-23 against capacity and losses.
What we changed
Production set-up reworked around the constraint, with output monitored every shift.
The result
64 → 84 units per shift, a 32% production improvement.

Selected improvement project · Quality & Cost

The challenge
Transaxle rework was driving avoidable cost month after month.
What we analysed
Rework cost trend and rejection reasons analysed to isolate repeat causes.
What we changed
Root causes corrected and controls put in place at the source of the defect.
The result
25 transaxle reworks per month removed; ₹12 lakh per year saving. Rework cost cut from ₹1.08L to ₹0.10L per month.

Selected improvement project · Delivery

The challenge
Testing time per transaxle was limiting throughput.
What we analysed
Testing cycle broken down step by step to find non-value time.
What we changed
Test sequence tightened, removing 15 seconds per transaxle.
The result
2,880 additional transaxles per year of capacity released.

Selected improvement project · Safety & 5S

The challenge
First-aid cases and workplace standards needed to improve together.
What we analysed
Incident causes, audit scores and open actions reviewed against the 5S standard.
What we changed
Risk-based actions closed and 5S discipline audited on a fixed cycle.
The result
First-aid cases 24 → 5, a 79% reduction. 5S score 65% → 85%, sustained for one year.

Solutions

Six ways we work inside a plant.

01

Manufacturing & Business Analytics

Turn production, quality, cost and delivery data into decisions leadership can act on.

02

Profitability & Cost Reduction

Locate profit leakage across material, labour, energy, scrap and inventory.

03

PQCDSM Improvement

Improve the six dimensions that decide plant performance, with owners and targets.

04

Power BI Dashboards

KPI tracking and MIS reporting that plant heads actually use in reviews.

05

5S, TPM, Lean & Kaizen

Implementation on the floor — audits, standards, and improvement that holds.

06

ISO Implementation & Internal Audit Support

Systems, documentation and audit readiness aligned to how the plant runs.

The people behind ShivTech

Manufacturing, data, finance and people — in one team.

Sagar A. Shete

Founder · Manufacturing & Business Analytics Consultant

16 years of experience across automotive and manufacturing operations.

  • Manufacturing & Assembly Operations
  • Transaxle Assembly & Testing
  • Supply Chain & Inventory Management
  • Business Analytics & Power BI
  • PQCDSM Improvement
  • Lean Manufacturing & Kaizen
  • TPM & 5S
  • Cost Reduction
  • Operational Excellence
  • Quality & Process Improvement

Snehal Shete

Owner · Finance & Training Consultant

Connects shop-floor improvement to financial impact, and makes it stick through training.

  • Financial Analysis
  • Cost Monitoring
  • Cost Reduction
  • Cost Control
  • Profitability Improvement
  • Budgeting
  • Financial Planning
  • Employee Training
  • Development
  • Training Program Design
  • Continuous Improvement Awareness
  1. Identify the problem
  2. Analyze the data
  3. Improve the process
  4. Calculate financial impact
  5. Train people
  6. Sustain results

Vision

Strengthening Indian manufacturing.Building world-class organizations.

Local manufacturing World-class manufacturing

Make in India Made in India for the world

Why ShivTech

Data alone doesn’t improve a factory.

Data

+ Manufacturing knowledge

+ Shop-floor action

+ Financial impact

+ People

= Sustainable improvement

What could your data improve?

Let’s identify the losses, find the root cause, implement practical solutions, and measure the business impact.

ShivTech Analytics & Solutions

Turning data & shop-floor challenges into business results.

Contact

Start the conversation.

Tell us where performance is leaking — productivity, quality, cost, delivery, safety or people. We will come back with how we would measure it, analyse it and quantify the improvement.